Stargate is a massive infrastructure AI datacenter buildout project led by OpenAI, SoftBank, and MGX. The first Stargate site is in Abilene.

The stated cost for the project is 100 billion.

Stargate 1 / Abilene

Project Ludicrous is a datacenter buildout in Abilene where Crusoe and OCI will build a supercomputer based on Blackwell GPUs.

It will have eight buildings with “up to” 50,000 GPUs per building,1 and 64,000 B200 GPUs are expected to be deployed there by 2026.2

As of 2025, has the infrastructure being built out for two of those buildings. This amounts to 200 MW and 100,000 Blackwell GPUs. The cost of the infrastructure buildout was around 3.4 billion datacenter development,31 this implies that the cost of the contents of these datacenters is $2.3 billion.

The site has plans to increase to 1.2 GW “in two years”41 which aligns with the ambition to build eight buildings.

Physical infrastructure

Abilene was chosen because of its proximity to excess wind power.

The Crusoe development is occurring on a 1000-acre site owned by Lancium that is dubbed the Lancium Clean Campus. As of 2025, it had two datacenters under development:

  1. A 482,000 sqft facility with an estimated cost of $292 million whose construction began in June 2024 and will be completed by May 2025, with $140 million in tenant improvements to be completed by September 20255
  2. A 484,960 sqft facility with an estimated cost of $292 million whose construction began in September 2024 and will be completed in September 2025, with $384 million in tenant improvements to be completed by December 2025.5

An application to construct a 360.5 MW simple cycle gas-fired power plant at the Abilene site were filed in January 2025.6 This will serve as backup power for the site1 and will not be connected to the grid.6 GE Vernova and Solar Turbines are each providing half of the turbines.6

This datacenter complex will use dry cooling.1

Footnotes

  1. Inside OpenAI’s Stargate Megafactory with Sam Altman | The Circuit 2 3 4 5

  2. OpenAI and Oracle to deploy 64,000 GB200 GPUs at Stargate Abilene data center by 2026 – report - DCD

  3. Commercial Observer

  4. Crusoe to Build Initial 200 MW AI Data Center With Plans to Expand at 1.2 GW Lancium Clean Campus (crusoe.ai)

  5. Here’s the Cost, Construction Timeline of Abilene Stargate Data Center - Business Insider 2